Prepare the new-build subgrade
Trim construction ground, remove unsuitable surface material and establish sensible falls away from the house, paving and driveway.
From construction subgrade to finished lawn levels—screened topsoil supply, placement and accurate preparation for ready lawn, hydroseed or conventional grass seed across Christchurch.
Operated by Sifty Soil Solutions
The best time to establish correct lawn levels is while machinery access is still available and before fences, landscaping and other finishing work restrict the site.
Trim construction ground, remove unsuitable surface material and establish sensible falls away from the house, paving and driveway.
Place clean screened topsoil to the required depth while maintaining finished heights around slabs, paths, patios and drainage points.
Accurately trim and grade the surface for ready lawn, hydroseed or conventional grass seed.

For a new build, the required quantity also depends on the existing subgrade and the finished heights beside slabs, paving and drainage.
Ideally after the main construction earthworks and permanent hard-surface levels are known, but before fencing and landscaping restrict machinery access.
Yes. We can prepare the construction subgrade, supply screened topsoil, spread it and complete the final grading required for the selected lawn finish.
The suitable depth depends on the existing subgrade, required finished heights and intended lawn result. Site plans, photos and measurements help establish the correct volume.
Yes. These fixed heights are important reference points. The lawn should finish below hard surfaces while maintaining suitable falls away from the house.
Text the new-build address, site photos, approximate lawn area and intended finish. We will confirm what else is needed.
Operated by Sifty Soil Solutions